The existing resin floor at this site was in need of refurbishment, as the existing paintwork on the floor was flaking and worn, and in some areas the were marked oil stains.
The areas around the inspection pit required resurfacing and new lane markings to ensure there was compliance DVSA requirements, and to ensure the surface would meet with HSE slip test recommendations to help improve safety at the site.